You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Batu Kali Segmen Inlet Setu Babakan Sudah 80 Persen
.
photo Mustaqim Amna - Beritajakarta.id

Inlet Setu Babakan Sheet Pile Repair Has Touched 80 Percent

The Inlet Setu Babakan sheet pile repair in Srengseng Sawah, Jagakarsa TPU area carried out by the South Jakarta Water Resources Sub-agency keeps being accelerated.

We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height

The repair itself has been started since early March and is targeted to be complete by the end of this month and now has reached 80 percent.

"We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height," expressed South Jakarta Water Resources Sub-agency's Maintenance Division Head, Junjung, Sunday (5/17).

Setu Babakan PBB Made as Leading Tourist Destination

He explained, after it is done, the sheet pile would again function as a link to the flow of water from Depok to Setu Babakan.

"Our problem is only about the sufficient flow of water," he stated.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye716 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye603 personFolmer
  3. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye289 personBudhi Firmansyah Surapati
  4. Transjakarta Ready to Support People's Mobility This Eid

    access_time30-03-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye250 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik