You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki 304 Turap Batu Kali Selama Januari-April
.
photo istimewa - Beritajakarta.id

January-April, 304 Retaining Walls Repaired in South Jakarta

In January-April period, South Jakarta Water Resources (SDA) Sub-agency has repaired 304 retaining walls in the region.

Length of the retaining wall that we have repaired vary between 2.5 - 115 meters

South Jakarta SDA Sub-agency Head, Mustajab stated, from that amount, his side has repaired 272 road channels' retaining wall, 25 PHB channels' retaining walls, and 7 rivers' retaining walls.

"Length of the retaining wall that we have repaired vary between 2.5 - 115 meters," he mentioned, Wednesday (5/6).

Ciliwung PHB Retaining Wall has Been Repaired

According to him, most retaining wall repairs were made in Jagakarsa with total 112 areas, while the least in Setiabudi with total 12 areas.

"Retaining wall repairs are mostly done during rainy season because this season has a major impact on the condition of retaining walls," he closed.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye520 personBudhi Firmansyah Surapati
  2. Rano Requests PBSI to Hold Governor's Cup Championship

    access_time31-05-2025 remove_red_eye411 personBudhi Firmansyah Surapati
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye311 personDessy Suciati
  4. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye264 personAldi Geri Lumban Tobing
  5. City Government Commits to Preserve and Promote Betawi Culture

    access_time02-06-2025 remove_red_eye239 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik