You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki 304 Turap Batu Kali Selama Januari-April

January-April, 304 Retaining Walls Repaired in South Jakarta

In January-April period, South Jakarta Water Resources (SDA) Sub-agency has repaired 304 retaining walls in the region.

Length of the retaining wall that we have repaired vary between 2.5 - 115 meters

South Jakarta SDA Sub-agency Head, Mustajab stated, from that amount, his side has repaired 272 road channels' retaining wall, 25 PHB channels' retaining walls, and 7 rivers' retaining walls.

"Length of the retaining wall that we have repaired vary between 2.5 - 115 meters," he mentioned, Wednesday (5/6).

Ciliwung PHB Retaining Wall has Been Repaired

According to him, most retaining wall repairs were made in Jagakarsa with total 112 areas, while the least in Setiabudi with total 12 areas.

"Retaining wall repairs are mostly done during rainy season because this season has a major impact on the condition of retaining walls," he closed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye834 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye610 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye574 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye554 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye462 personFolmer