You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki 304 Turap Batu Kali Selama Januari-April

January-April, 304 Retaining Walls Repaired in South Jakarta

In January-April period, South Jakarta Water Resources (SDA) Sub-agency has repaired 304 retaining walls in the region.

Length of the retaining wall that we have repaired vary between 2.5 - 115 meters

South Jakarta SDA Sub-agency Head, Mustajab stated, from that amount, his side has repaired 272 road channels' retaining wall, 25 PHB channels' retaining walls, and 7 rivers' retaining walls.

"Length of the retaining wall that we have repaired vary between 2.5 - 115 meters," he mentioned, Wednesday (5/6).

Ciliwung PHB Retaining Wall has Been Repaired

According to him, most retaining wall repairs were made in Jagakarsa with total 112 areas, while the least in Setiabudi with total 12 areas.

"Retaining wall repairs are mostly done during rainy season because this season has a major impact on the condition of retaining walls," he closed.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye978 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye740 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye717 personAldi Geri Lumban Tobing
  4. Five New Garbage Trucks Operated at Kramat Jati Market

    access_time01-05-2026 remove_red_eye587 personNurito
  5. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye584 personAldi Geri Lumban Tobing