You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki 304 Turap Batu Kali Selama Januari-April

January-April, 304 Retaining Walls Repaired in South Jakarta

In January-April period, South Jakarta Water Resources (SDA) Sub-agency has repaired 304 retaining walls in the region.

Length of the retaining wall that we have repaired vary between 2.5 - 115 meters

South Jakarta SDA Sub-agency Head, Mustajab stated, from that amount, his side has repaired 272 road channels' retaining wall, 25 PHB channels' retaining walls, and 7 rivers' retaining walls.

"Length of the retaining wall that we have repaired vary between 2.5 - 115 meters," he mentioned, Wednesday (5/6).

Ciliwung PHB Retaining Wall has Been Repaired

According to him, most retaining wall repairs were made in Jagakarsa with total 112 areas, while the least in Setiabudi with total 12 areas.

"Retaining wall repairs are mostly done during rainy season because this season has a major impact on the condition of retaining walls," he closed.

Linked News
Popular News indeks
  1. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye956 personAldi Geri Lumban Tobing
  2. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye859 personAldi Geri Lumban Tobing
  3. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye846 personAldi Geri Lumban Tobing
  4. Pramono Praises JRF, Says City Is Becoming a Trusted Event Host

    access_time23-10-2026 remove_red_eye688 personDessy Suciati
  5. Jakarta Records Improved Air Quality on First Day of JRF 2026

    access_time24-10-2026 remove_red_eye669 personBudhi Firmansyah Surapati