You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Batu Kali Segmen Inlet Setu Babakan Sudah 80 Persen
.
photo Mustaqim Amna - Beritajakarta.id

Inlet Setu Babakan Sheet Pile Repair Has Touched 80 Percent

The Inlet Setu Babakan sheet pile repair in Srengseng Sawah, Jagakarsa TPU area carried out by the South Jakarta Water Resources Sub-agency keeps being accelerated.

We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height

The repair itself has been started since early March and is targeted to be complete by the end of this month and now has reached 80 percent.

"We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height," expressed South Jakarta Water Resources Sub-agency's Maintenance Division Head, Junjung, Sunday (5/17).

Setu Babakan PBB Made as Leading Tourist Destination

He explained, after it is done, the sheet pile would again function as a link to the flow of water from Depok to Setu Babakan.

"Our problem is only about the sufficient flow of water," he stated.

Linked News
Popular News indeks
  1. Jakarta Fair Kemayoran Begins, Hailing City’s 498th Anniversary

    access_time20-06-2025 remove_red_eye360 personDessy Suciati
  2. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye288 personDessy Suciati
  3. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye265 personDessy Suciati
  4. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye254 personAldi Geri Lumban Tobing
  5. Bank Jakarta Officially Launched, Aiming for IPO and Global Competitiveness

    access_time23-06-2025 remove_red_eye228 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik