You don't have javascript enabled. Good luck with that.
Pencarian
459 Sumur Resapan Telah Dibangun di Jaksel

459 Infiltration Wells Have Been Built in South Jakarta

The South Jakarta Water Resources (SDA) Sub-agency says as many as 459 infiltration wells have been built at 135 points spread over 10 sub-districts.

Its development is part of the Regional Strategic Activities (KSD) in order to overcome the problem of flooding in the rainy season

South Jakarta SDA Sub-agency Head Mustajab said that the initial existence of infiltration wells was only 428 units at 119 points. But its number increased by 31 units at 16 points in March.

"Its development is part of the Regional Strategic Activities (KSD) in order to overcome the problem of flooding in the rainy season," he expressed, Tuesday (7/14).

Two Infiltration Wells are Being Built in Lancang Island

Of 459 wells, 56 out of them were in Pesanggrahan, 55 were in Setiabudi, 53 were in Kebayoran Baru, 32 were in Kebayoran Lama, 50 were Cilandak, 48 were in Jagakarsa, 43 were in Mampang Prapatan, 42 were in Pasar Minggu and Tebet were 38 were in Pancoran.

He added, there are 10 urban villages in South Jakarta that are designated as priority locations for the infiltration well development pilot project. They are Cipedak, Srengseng Sawah, Jatipadang, Cilandak Barat, Cipete Utara, Pondok Labu, Lebak Bulus, Pesanggrahan, Mampang and Karet Semanggi.

"We'll build wells in strategic locations such as urban village and sub-district offices, RPTRAs, schools, urban parks to mosques in local government offices," he closed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1058 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye994 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye926 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye706 personAldi Geri Lumban Tobing