You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Joging Track di Waduk Setu Rampung

Setu Reservoir is Now Equipped with Jogging Track

Jogging track construction at Setu Reservoir, Setu Urban Village, Cipayung, East Jakarta has been completed on Wednesday (7/22). According to plan, East Jakarta Mayor, Muhammad Anwar will inaugurate this sport facility by the end of July.

We deploy 25 joint personnel from SDA and PPSU for the construction

Setu Urban Village Head, Jenuri conveyed, its construction has been started since Friday (7/17). This jogging track is as long as 200 meters with width 1 meter and beautified with decorative plants and vegetables on the sides of the track.

"We deploy 25 joint personnel from SDA and PPSU for the construction," he conveyed, Thursday (7/23).

Three Reservoirs in East Jakarta Designed for Ecotourism

In making the jogging track, his side used material given by urban village side and TNI AD Teritorrial Center (Puster).

He expected this sport facility can make happier people who visit Setu Reservoir.

"We keep reminding Setu Reservoir visitors to comply with health protocols," he asserted.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5481 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4618 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1825 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1034 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1023 personFakhrizal Fakhri