You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Joging Track di Waduk Setu Rampung
.
photo Nurito - Beritajakarta.id

Setu Reservoir is Now Equipped with Jogging Track

Jogging track construction at Setu Reservoir, Setu Urban Village, Cipayung, East Jakarta has been completed on Wednesday (7/22). According to plan, East Jakarta Mayor, Muhammad Anwar will inaugurate this sport facility by the end of July.

We deploy 25 joint personnel from SDA and PPSU for the construction

Setu Urban Village Head, Jenuri conveyed, its construction has been started since Friday (7/17). This jogging track is as long as 200 meters with width 1 meter and beautified with decorative plants and vegetables on the sides of the track.

"We deploy 25 joint personnel from SDA and PPSU for the construction," he conveyed, Thursday (7/23).

Three Reservoirs in East Jakarta Designed for Ecotourism

In making the jogging track, his side used material given by urban village side and TNI AD Teritorrial Center (Puster).

He expected this sport facility can make happier people who visit Setu Reservoir.

"We keep reminding Setu Reservoir visitors to comply with health protocols," he asserted.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1507 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye929 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye431 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye411 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye399 personFolmer