You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Joging Track di Waduk Setu Rampung
.
photo Nurito - Beritajakarta.id

Setu Reservoir is Now Equipped with Jogging Track

Jogging track construction at Setu Reservoir, Setu Urban Village, Cipayung, East Jakarta has been completed on Wednesday (7/22). According to plan, East Jakarta Mayor, Muhammad Anwar will inaugurate this sport facility by the end of July.

We deploy 25 joint personnel from SDA and PPSU for the construction

Setu Urban Village Head, Jenuri conveyed, its construction has been started since Friday (7/17). This jogging track is as long as 200 meters with width 1 meter and beautified with decorative plants and vegetables on the sides of the track.

"We deploy 25 joint personnel from SDA and PPSU for the construction," he conveyed, Thursday (7/23).

Three Reservoirs in East Jakarta Designed for Ecotourism

In making the jogging track, his side used material given by urban village side and TNI AD Teritorrial Center (Puster).

He expected this sport facility can make happier people who visit Setu Reservoir.

"We keep reminding Setu Reservoir visitors to comply with health protocols," he asserted.

Linked News
Popular News indeks
  1. 21 Damaged Roads in Cilincing Repaired

    access_time11-07-2025 remove_red_eye550 personAnita Karyati
  2. Implementation of Free Schools Awaits Central Regulations, Pramono Says

    access_time11-07-2025 remove_red_eye460 personDessy Suciati
  3. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  4. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  5. Commission E Pushes for Accelerated Health Center Revitalization

    access_time11-07-2025 remove_red_eye369 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik