You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Joging Track di Waduk Setu Rampung

Setu Reservoir is Now Equipped with Jogging Track

Jogging track construction at Setu Reservoir, Setu Urban Village, Cipayung, East Jakarta has been completed on Wednesday (7/22). According to plan, East Jakarta Mayor, Muhammad Anwar will inaugurate this sport facility by the end of July.

We deploy 25 joint personnel from SDA and PPSU for the construction

Setu Urban Village Head, Jenuri conveyed, its construction has been started since Friday (7/17). This jogging track is as long as 200 meters with width 1 meter and beautified with decorative plants and vegetables on the sides of the track.

"We deploy 25 joint personnel from SDA and PPSU for the construction," he conveyed, Thursday (7/23).

Three Reservoirs in East Jakarta Designed for Ecotourism

In making the jogging track, his side used material given by urban village side and TNI AD Teritorrial Center (Puster).

He expected this sport facility can make happier people who visit Setu Reservoir.

"We keep reminding Setu Reservoir visitors to comply with health protocols," he asserted.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1408 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye847 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye649 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye597 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye470 personBudhi Firmansyah Surapati