You don't have javascript enabled. Good luck with that.
Pencarian
Lima Sumur Resapan Dibangun di Depan Gedung BPKP RI

Five Infiltration Wells Construction on Jl. Pramuka Reaches 90 Percent

Process of constructing five infiltration wells on Jalan Pramuka, Utan Kayu Utara, Matraman, East Jakarta has reached 90 percent.

We build it manually starting October and now its process reaches 90 percent

Matraman Water Resources (SDA) Sub-agency Unit Head, Erland Sianipar conveyed, those five infiltration wells are located in front of BPKP RI Building.

"We build it manually starting October and now its process reaches 90 percent. It is estimated to finish next week," he explained, Tuesday (11/10).

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

His side deployed 10 personnel from Matraman Sub-district SDA Unit to build infiltration wells with depth 3 meters and 1 meter.

"These five infiltration wells are built to anticipate inundation in rainy season," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye356 personAldi Geri Lumban Tobing
close