You don't have javascript enabled. Good luck with that.
Pencarian
UP PKB Ujung Menteng Bangun Taman dan Joging Track

Ujung Menteng UP PKB Builds Park and Jogging Track

Ujung Menteng Motor Vehicle Testing Management Unit (UP PKB), Cakung, East Jakarta currently builds park and jogging track.

We build park and jogging track to make the area more beautiful and greener

Ujung Menteng UP PKB Head, Suratman mentioned, parks and jogging track are being built on the east side of vehicle track for KIR test.

"We build park and jogging track to make the area more beautiful and greener," he said, Friday (11/27).

TIM Parking Building Construction Reaches 98.31 Percent

Ujung Menteng UP PKB PJLP personnel build park and jogging track in stages.

For jogging track, it will be built using used colored concrete blocks as long as 300 meter with average width of 110 centimeters.

This place will be also equipped with 2 fish ponds with size of 200 and 500 square meters each.

Meanwhile, the park will be made like an hallway overgrown with flowers in different colors that make it more beautiful and can be used as selfie area.

"Park and jogging track construction process has reached 50 percent. Our target is to finish it by the end of December thus visitors can relax and exercise in this place," he stated.

Linked News
Popular News indeks
  1. East Jakarta Satpol PP Deployed to Ensure Safe Eid Travel Period

    access_time16-03-2026 remove_red_eye973 personNurito
  2. Pramono Inaugurates 26 Home Renovation Units

    access_time16-03-2026 remove_red_eye641 personDessy Suciati
  3. Governor Attends Melasti Ceremony at Segara Temple

    access_time15-03-2026 remove_red_eye601 personBudhi Firmansyah Surapati
  4. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye545 personAnita Karyati
  5. 24,412 Homecoming Travelers Departed from Senen Station

    access_time17-03-2026 remove_red_eye449 personFolmer