You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Dinding Turap Kali Baru

Baru RIver's Retaining Wall in Lenteng Agung Repaired by South Jakarta SDA

South Jakarta Water Resources (SDA) Sub-agency repaired Baru River's retaining wall near Tapal Kuda Flyover on Lenteng Agung Urban Village, Jagakarsa, South Jakarta.

We repair it because some parts have been collapsed due to age

South Jakarta SDA Sub-agency Head, Mustajab conveyed, retaining wall with length more than 400 meters, height 1.8-4 meters, and width 4 meters needed to be repaired because it was brittle and prone to collapse.

"We repair it because some parts have been collapsed due to age," he mentioned, Wednesday (12/2).

Baru River Retaining Wall Repair in Jatinegara Touches 85 Percent

Retaining wall repair had been carried out since September 27 which involved 25 personnel from South Jakarta SDA Sub-agency. This repair was targeted to finish in mid of December.

"So far we have repaired about 300 meters," he added.

After being repaired, he hopes it won't collapse easily when heavy rain falls. Thus water can flow smoothly and doesn't overflow onto the road.

"Hopefully Baru River will no longer overflow thus road will not be inundated," he said.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1707 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye701 personFakhrizal Fakhri
  3. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye461 personDessy Suciati
  4. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye441 personDessy Suciati
  5. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye430 personBudhi Firmansyah Surapati