You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Dinding Turap Kali Baru

Baru RIver's Retaining Wall in Lenteng Agung Repaired by South Jakarta SDA

South Jakarta Water Resources (SDA) Sub-agency repaired Baru River's retaining wall near Tapal Kuda Flyover on Lenteng Agung Urban Village, Jagakarsa, South Jakarta.

We repair it because some parts have been collapsed due to age

South Jakarta SDA Sub-agency Head, Mustajab conveyed, retaining wall with length more than 400 meters, height 1.8-4 meters, and width 4 meters needed to be repaired because it was brittle and prone to collapse.

"We repair it because some parts have been collapsed due to age," he mentioned, Wednesday (12/2).

Baru River Retaining Wall Repair in Jatinegara Touches 85 Percent

Retaining wall repair had been carried out since September 27 which involved 25 personnel from South Jakarta SDA Sub-agency. This repair was targeted to finish in mid of December.

"So far we have repaired about 300 meters," he added.

After being repaired, he hopes it won't collapse easily when heavy rain falls. Thus water can flow smoothly and doesn't overflow onto the road.

"Hopefully Baru River will no longer overflow thus road will not be inundated," he said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1419 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye858 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye653 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye604 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye477 personBudhi Firmansyah Surapati