You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Dinding Turap Kali Baru

Baru RIver's Retaining Wall in Lenteng Agung Repaired by South Jakarta SDA

South Jakarta Water Resources (SDA) Sub-agency repaired Baru River's retaining wall near Tapal Kuda Flyover on Lenteng Agung Urban Village, Jagakarsa, South Jakarta.

We repair it because some parts have been collapsed due to age

South Jakarta SDA Sub-agency Head, Mustajab conveyed, retaining wall with length more than 400 meters, height 1.8-4 meters, and width 4 meters needed to be repaired because it was brittle and prone to collapse.

"We repair it because some parts have been collapsed due to age," he mentioned, Wednesday (12/2).

Baru River Retaining Wall Repair in Jatinegara Touches 85 Percent

Retaining wall repair had been carried out since September 27 which involved 25 personnel from South Jakarta SDA Sub-agency. This repair was targeted to finish in mid of December.

"So far we have repaired about 300 meters," he added.

After being repaired, he hopes it won't collapse easily when heavy rain falls. Thus water can flow smoothly and doesn't overflow onto the road.

"Hopefully Baru River will no longer overflow thus road will not be inundated," he said.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2403 personDessy Suciati
  2. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye790 personTiyo Surya Sakti
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye697 personDessy Suciati
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye636 personTiyo Surya Sakti
  5. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye521 personNurito