You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Dinding Turap Kali Baru

Baru RIver's Retaining Wall in Lenteng Agung Repaired by South Jakarta SDA

South Jakarta Water Resources (SDA) Sub-agency repaired Baru River's retaining wall near Tapal Kuda Flyover on Lenteng Agung Urban Village, Jagakarsa, South Jakarta.

We repair it because some parts have been collapsed due to age

South Jakarta SDA Sub-agency Head, Mustajab conveyed, retaining wall with length more than 400 meters, height 1.8-4 meters, and width 4 meters needed to be repaired because it was brittle and prone to collapse.

"We repair it because some parts have been collapsed due to age," he mentioned, Wednesday (12/2).

Baru River Retaining Wall Repair in Jatinegara Touches 85 Percent

Retaining wall repair had been carried out since September 27 which involved 25 personnel from South Jakarta SDA Sub-agency. This repair was targeted to finish in mid of December.

"So far we have repaired about 300 meters," he added.

After being repaired, he hopes it won't collapse easily when heavy rain falls. Thus water can flow smoothly and doesn't overflow onto the road.

"Hopefully Baru River will no longer overflow thus road will not be inundated," he said.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5560 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye904 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye807 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye782 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye726 personBudhi Firmansyah Surapati