You don't have javascript enabled. Good luck with that.
Pencarian
 Pengecoran Tanggul Penahan Gelombang Pulau Untung Jawa Rampung
.
photo Suparni - Beritajakarta.id

Wave Barrier Repair on Untung Jawa Island Completed

Certainly this can reduce the risk of abrasion and tidal wave

The Thousand Islands Water Resources (SDA) Sub-agency has completed repair of the breakwater to absorb the energy of the waves that hit it on the north side of Untung Jawa Island, Untung Island Jawa Urban Village, South Thousand Islands Sub-district.

The barrier stretches for 422 meters covering the areas of RT 01/03, RT 02/02 and RT 03/03. This repair project includes, reinstalling the cube, installing wire gabions and casting the top of the barrier.

Eleven Breakwater Embankments on Residential Islands Installed

Thousand Islands SDA Sub-agency Head Abdul Rouf said, the barrier collapsed after being hit by waves last June.

"Then we immediately repaired it in stage by sending 24 personnel and it was finished last month," he told.

By so, the settlements on Untung Jawa Island would be safe from waves that might trigger inundation or flooding.

"Certainly this can reduce the risk of abrasion and tidal wave," he stated.

Linked News
Popular News indeks
  1. Survivors of Collapsed Houses in Malaka Jaya Receive Social Assistance

    access_time30-01-2025 remove_red_eye2203 personNurito
  2. Logistics Aid for Jakarta Flood Victims Keeps Being Distributed

    access_time30-01-2025 remove_red_eye982 personAldi Geri Lumban Tobing
  3. City Council Chairman Supports City Government Optimizing Assistance for Rorotan Farmers

    access_time30-01-2025 remove_red_eye674 personDessy Suciati
  4. N. Jakarta Vice Mayor Distributes Assistance to Flood Survivors in Sukapura

    access_time30-01-2025 remove_red_eye478 personAnita Karyati
  5. Rain Brings Excitement to Rawa Belong Milkfish Festival 2025

    access_time28-01-2025 remove_red_eye448 personFolmer