You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Modular Tank di Green Garden Rampung
.
photo Rudi Hermawan - Beritajakarta.id

Green Garden Infiltration Wells Construction Estimated to Finish Within a Week

In a week, modular tank infiltration wells construction carried out on Jl. Kompleks Green Garden Blok L, RT 12/04, Kedoya Utara, Kebon Jeruk, West Jakarta will be completed.

Since this is the final touch, we estimate it to finish within a week

Kebon Jeruk Sub-district Water Resources (SDA) Unit Head, Suprapto stated, infiltration well construction whad been started since November 14. Infiltration wells were built along 100 meters with capacity of 300 cubic meters.

"Since this is the final touch, we estimate it to finish within a week," he said, Thursday (12/17).

92 Infiltration Wells Built in West Jakarta

His side deployed 7 SDA Unit personnel to build it. Infiltration well has size of 4 meters long, 3 meters wide, and 1.5 meters deep. Each of them installed with 54 modular tanks.

"The advantages of infiltration wells with modular tanks are lighter, faster to build, don't need heavy equipment, have stronger structure and don't need maintenance," he conveyed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1045 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye553 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye449 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing