You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Modular Tank di Green Garden Rampung

Green Garden Infiltration Wells Construction Estimated to Finish Within a Week

In a week, modular tank infiltration wells construction carried out on Jl. Kompleks Green Garden Blok L, RT 12/04, Kedoya Utara, Kebon Jeruk, West Jakarta will be completed.

Since this is the final touch, we estimate it to finish within a week

Kebon Jeruk Sub-district Water Resources (SDA) Unit Head, Suprapto stated, infiltration well construction whad been started since November 14. Infiltration wells were built along 100 meters with capacity of 300 cubic meters.

"Since this is the final touch, we estimate it to finish within a week," he said, Thursday (12/17).

92 Infiltration Wells Built in West Jakarta

His side deployed 7 SDA Unit personnel to build it. Infiltration well has size of 4 meters long, 3 meters wide, and 1.5 meters deep. Each of them installed with 54 modular tanks.

"The advantages of infiltration wells with modular tanks are lighter, faster to build, don't need heavy equipment, have stronger structure and don't need maintenance," he conveyed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1057 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye993 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye965 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye925 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye705 personAldi Geri Lumban Tobing