You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Penghubung Kali Sunter Mulai Dikeruk
.
photo istimewa - Beritajakarta.id

Pulogadung PHB Dredged

One of the ways done by East Jakarta Administration to minimize flooding in the municipality is dredging the Pulogadung connecting channel (PHB) towards Sunter. The PHB that connects Petukangan River in Rawa Terate, Cakung, has been dredged since Saturday (1/11). The work is done from bridge on Jalan Bekasi Raya until Sunter River, precisely behind PT Aneka Tambang office.

This channel has not been dredged for five years. That’s why sedimentation occurs and the channel does not functioning at all

“The channel is dredged for 200 meters long with 1 meter deep. The work is targeted to finish by the end of this month,” stated Head of Conservation Section for East Jakarta Water Management Public Works Sub-Department, Nursiwan, Saturday (1/11).

For information, the 12-meter wide PHB is dredged because its condition is unworthy anymore due to sedimentation. Moreover, the channel is also strewn with mud, grass and weeds that grow 50-80 centimeters, and trashes that came from a chicken slaughterhouse. As a result, the area becomes smelly and dirty.

Sunter River Culverts Clogged

According to Nursiwan, if the dredging PHB was not immediately dredged, it would trigger flood. All this time, Pulogadung Industrial Zone (KIP) and settlements in Rawa Terate are often inundated during rainy season with water level reaches 1-1.5 meters high. And Pulogadung PHB is one of the sources that triggers flood in that area.

“This channel has not been dredged for five years. That’s why sedimentation occurs and the channel does not functioning at all,” he uttered.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye407 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye400 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye280 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye274 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik