You don't have javascript enabled. Good luck with that.
Pencarian
Empat Pompa Kuras Waduk Cilangkap

Personnel Draining Water from Cilangkap Reservoir to Anticipate Overflow

Anticipating high water level and overflow, Cipayung Sub-district Water Resources (SDA) Task Force drained Cilangkap Reservoir on Thursday (2/18).

We pump and drain water to Cilangkap connecting channel

Cipayung Sub-district Head, Fajar Eko Satrio mentioned, personnel drained the reservoir using 3 floating pumps and 1 mobile pump to reduce water level at reservoir.

"We pump and drain water to Cilangkap connecting channel," he added.

SDA Sub-agency: Pumps in North Jakarta are in Prime Condition

Draining was carried out thus reservoir embankment did not burst, because sluice gate at reservoir outlet was damaged and not functioning.

By draining the water, he expected reservoirs can hold more rainwater when heavy rain falls.

"We will continue to drain it if water level in reservoir is quite high," he conveyed.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1416 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye850 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye653 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye602 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye474 personBudhi Firmansyah Surapati