You don't have javascript enabled. Good luck with that.
Pencarian
38 Personel Gabungan Dikerahkan Atasi Penanganan Pasca Banjir di Cipinang Muara

Joint Personnel Deployed to Cipinang Muara for Post-flood Handling

Together they clean up mud and trash left by flooding. The mud thickness reaches about 10-15 cm high. We push some to Sunter River

Some 38 joint personnel of Satpol PP, PPSU and urban village have been dispatched to assist residents in post-flood handling on Jalan Cipinang Bali, RT 06/RW 07 and RT 12/RW 13 Cipinang Muara, Jatinegara, East Jakarta.

East Jakarta Gulkarmat Deploys 22 Rubber Boats to Evacuate Residents

Cipinang Muara Urban Village Secretary Ciptono said it was carried out in RT 06, 07 and 12/RW 13, as the area was the lowest position and was close to the Sunter Riverbank. Personnel helped locals whose neighborhoods affected by the flood since Friday (2/19).

"Together they clean up mud and trash left by flooding. The mud thickness reaches about 10-15 cm high. We push some to Sunter River," he explained, Monday (2/22).

On Sunday (2/21) yesterday, joint personnel and residents also cleaned the environment at RW 16 Cipinang Indah.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1098 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye581 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye530 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye512 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye508 personNurito