You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Tuntaskan Perbaikan Tanggul Kali Pesanggrahan
.
photo TP Moan Simanjuntak - Beritajakarta.id

Cracked Embankment in IKPN Housing Complex Completely Repaired

The repair work of the cracked Pesanggrahan River's embankment in the Civil Servant Cooperative Association Housing Complex (IKPN) area, Jalan RC Veteran Raya, RT 03/04, Bintaro Urban Village, Pesanggrahan, finally completed.

We involve eight personnel to do the repair

Pesanggrahan Sub-district Water Resources (SDA) Sub-agency Executing Unit Head, Sutopo said the cracks occurred due to the overflowing water of Pesanggrahan River during heavy rains last week. The repair started on February 23 and completely done on March 1.

"We involve eight personnel to do the repair," he expressed, Wednesday (3/3).

1,104 Potholes Repaired in Central Jakarta

According to him, it was carried out by plastering the embankment about 15 meters long with a thick enough mortar to hold the water standing from the river.

Aside that, personnel were also assigned to conduct a routine maintenance at the location.

"By so, we hope the embankment will be stronger and more resistant to water seepage," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye557 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye453 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti