You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Tuntaskan Perbaikan Tanggul Kali Pesanggrahan
.
photo TP Moan Simanjuntak - Beritajakarta.id

Cracked Embankment in IKPN Housing Complex Completely Repaired

The repair work of the cracked Pesanggrahan River's embankment in the Civil Servant Cooperative Association Housing Complex (IKPN) area, Jalan RC Veteran Raya, RT 03/04, Bintaro Urban Village, Pesanggrahan, finally completed.

We involve eight personnel to do the repair

Pesanggrahan Sub-district Water Resources (SDA) Sub-agency Executing Unit Head, Sutopo said the cracks occurred due to the overflowing water of Pesanggrahan River during heavy rains last week. The repair started on February 23 and completely done on March 1.

"We involve eight personnel to do the repair," he expressed, Wednesday (3/3).

1,104 Potholes Repaired in Central Jakarta

According to him, it was carried out by plastering the embankment about 15 meters long with a thick enough mortar to hold the water standing from the river.

Aside that, personnel were also assigned to conduct a routine maintenance at the location.

"By so, we hope the embankment will be stronger and more resistant to water seepage," he stated.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye780 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye480 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye377 personBudhi Firmansyah Surapati
  5. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye348 personTiyo Surya Sakti