You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Tuntaskan Perbaikan Tanggul Kali Pesanggrahan

Cracked Embankment in IKPN Housing Complex Completely Repaired

The repair work of the cracked Pesanggrahan River's embankment in the Civil Servant Cooperative Association Housing Complex (IKPN) area, Jalan RC Veteran Raya, RT 03/04, Bintaro Urban Village, Pesanggrahan, finally completed.

We involve eight personnel to do the repair

Pesanggrahan Sub-district Water Resources (SDA) Sub-agency Executing Unit Head, Sutopo said the cracks occurred due to the overflowing water of Pesanggrahan River during heavy rains last week. The repair started on February 23 and completely done on March 1.

"We involve eight personnel to do the repair," he expressed, Wednesday (3/3).

1,104 Potholes Repaired in Central Jakarta

According to him, it was carried out by plastering the embankment about 15 meters long with a thick enough mortar to hold the water standing from the river.

Aside that, personnel were also assigned to conduct a routine maintenance at the location.

"By so, we hope the embankment will be stronger and more resistant to water seepage," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing