You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Tuntaskan Perbaikan Tanggul Kali Pesanggrahan

Cracked Embankment in IKPN Housing Complex Completely Repaired

The repair work of the cracked Pesanggrahan River's embankment in the Civil Servant Cooperative Association Housing Complex (IKPN) area, Jalan RC Veteran Raya, RT 03/04, Bintaro Urban Village, Pesanggrahan, finally completed.

We involve eight personnel to do the repair

Pesanggrahan Sub-district Water Resources (SDA) Sub-agency Executing Unit Head, Sutopo said the cracks occurred due to the overflowing water of Pesanggrahan River during heavy rains last week. The repair started on February 23 and completely done on March 1.

"We involve eight personnel to do the repair," he expressed, Wednesday (3/3).

1,104 Potholes Repaired in Central Jakarta

According to him, it was carried out by plastering the embankment about 15 meters long with a thick enough mortar to hold the water standing from the river.

Aside that, personnel were also assigned to conduct a routine maintenance at the location.

"By so, we hope the embankment will be stronger and more resistant to water seepage," he stated.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye787 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye545 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye527 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye526 personDessy Suciati