You don't have javascript enabled. Good luck with that.
Pencarian
Asisten Ekbang Jaktim Tinjau Tiga Waduk di Cipayung

Arrangement of Three Reservoirs in Cipayung Keeps Being Accelerated

We will accelerate the arrangement of the reservoir in order to smoothen water flow and to prevent inundation

The East Jakarta administration continues to speed up the arrangement of Cilangkap, Giri Kencana and Pondok Ranggon reservoirs, which are located in Cipayung Sub-district area.

This statement was asserted by Kusmanto, Assistant for East Jakarta Economic Development and Environment, when he surveyed the three reservoirs, Monday (3/8).

Jakarta Launches KSBB for Settlement Arrangement and Waste

He said it was done to determine the condition of the three reservoirs which are currently being normalized.

"We will accelerate the arrangement of the reservoir in order to smoothen water flow and to prevent inundation," he said.

According to him, in Cilangkap Reservoir area, there was a land of approximately 30 hectares. Part of it was used as a reservoir with two sections and part of it was still land.

"This is done thus the land can become a reservoir optimally," he said.

Then at Giri Kencana Reservoir as wide as 2.3 hectares, improvements would be made to the inlet channel and outlet.

As for Pondok Ranggon Reservoir, there was a 2.3-hectare width which would be used as reservoirs such as those in Pondok Ranggon 1 and 2.

"We're about to coordinate with the Park and Urban Forest Agency and the SDA Agency for the construction of the Pondok Ranggon 3 Reservoir. At least, as a water reservoir first," he stated.

Linked News
Popular News indeks
  1. Car Free Night Held on Eid Eve, Be There!

    access_time19-03-2026 remove_red_eye701 personDessy Suciati
  2. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye628 personAnita Karyati
  3. Jakarta Leaders Join Residents for Eid al-Fitr Prayer at City Hall

    access_time21-03-2026 remove_red_eye614 personFolmer
  4. Special Eid Services: Transjakarta Adjusts Operational Patterns

    access_time18-03-2026 remove_red_eye528 personAldi Geri Lumban Tobing
  5. Health Agency Urges Public to Be Alert for Extreme Hot Weather

    access_time19-03-2026 remove_red_eye484 personAldi Geri Lumban Tobing