You don't have javascript enabled. Good luck with that.
Pencarian
112 Titik Sheet Pile Bolong di Kali Moonkervart dan Kali Angke Ditambal

Kali Mookervart River Sheet Piles in Five Urban Villages Patched

The West Jakarta Water Resources (SDA) Sub-agency personnel have started patching the perforated sheet pile walls of Kali Mookervart River in five urban villages.

It has been ongoing since a week and is targeted to be complete in the upcoming April

Drainage Maintenance Division Head Wawan Kurniawan disclosed, those five urban villages were Kedoya Utara Urban Village (Kebon Jeruk), Rawa Buaya Urban Village (Cengkareng), Kedaung Kali Angke Urban Village (Cengkareng), Wijaya Kusuma Urban Village (Grogol Petamburan) and Jelambar Baru Urban Village (Grogol Petamburan).

"It has been ongoing since a week and is targeted to be complete in the upcoming April," he expressed, Friday (3/19).

Nine Cubic Waste Transported from Mookervart River

Based on the temporary data, around 112 points of sheet piles were in perforated or leaking conditions. To repair it, as many as 100 personnel had been alerted to the location.

"Hopefully the river can optimally accommodate the water in large quantities in order to minimize flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye987 personAldi Geri Lumban Tobing
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye704 personAldi Geri Lumban Tobing
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye674 personAldi Geri Lumban Tobing
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye656 personDessy Suciati
  5. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye648 personDessy Suciati