You don't have javascript enabled. Good luck with that.
Pencarian
112 Titik Sheet Pile Bolong di Kali Moonkervart dan Kali Angke Ditambal

Kali Mookervart River Sheet Piles in Five Urban Villages Patched

The West Jakarta Water Resources (SDA) Sub-agency personnel have started patching the perforated sheet pile walls of Kali Mookervart River in five urban villages.

It has been ongoing since a week and is targeted to be complete in the upcoming April

Drainage Maintenance Division Head Wawan Kurniawan disclosed, those five urban villages were Kedoya Utara Urban Village (Kebon Jeruk), Rawa Buaya Urban Village (Cengkareng), Kedaung Kali Angke Urban Village (Cengkareng), Wijaya Kusuma Urban Village (Grogol Petamburan) and Jelambar Baru Urban Village (Grogol Petamburan).

"It has been ongoing since a week and is targeted to be complete in the upcoming April," he expressed, Friday (3/19).

Nine Cubic Waste Transported from Mookervart River

Based on the temporary data, around 112 points of sheet piles were in perforated or leaking conditions. To repair it, as many as 100 personnel had been alerted to the location.

"Hopefully the river can optimally accommodate the water in large quantities in order to minimize flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2181 personDessy Suciati
  2. Immersive Room and Glowing Forest Attractions Enliven Eid at TMII

    access_time26-03-2026 remove_red_eye966 personFakhrizal Fakhri
  3. 292 East Jakarta Personnel Mobilized for Eid Return Rush

    access_time25-03-2026 remove_red_eye750 personNurito
  4. Jakarta's Mudik to Jakarta Program Hits Rp21 Trillion in Transactions

    access_time25-03-2026 remove_red_eye739 personFakhrizal Fakhri
  5. 10 Transjakarta Amari Buses Operated at Kalideres Terminal

    access_time25-03-2026 remove_red_eye734 personTiyo Surya Sakti