You don't have javascript enabled. Good luck with that.
Pencarian
Sisi Selatan Saluran Jl Akses Marunda Diturap

Damaged Sheet Piles on Marunda Access Road Repaired

River stone material is stronger to withstand vibrations from passing heavy vehicles

North Jakarta Water Resources (SDA) Sub-agency repairs sheet piles on the south side of Marunda access road, Semper Timur, Cilincing up to 120 meters long.

Cilincing Sub-district SDA Executing Unit Head Cahyono Budi Setiawan said it was carried out by re-developing the damaged sheet pile parts using river stone material.

Mud Dredging in Baru Barat River Appreciated by Locals

"River stone material is stronger to withstand vibrations from passing heavy vehicles," he expressed, Friday (10/9).

His side also demolished an inrit at the same location by involving 20 personnel plus some equipments and four trucks.

"This work is one of the realized musrenbang proposals," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1555 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1427 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1294 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1089 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye960 personDessy Suciati