You don't have javascript enabled. Good luck with that.
Pencarian
 Sudin Bina Marga Tata Trotoar di Jalan Raya Ragunan

Sidewalk Arrangement on Jalan Raya Ragunan Targeted to Be Completed in April

Sidewalk arrangement on Jalan Raya Ragunan, in front of Block D of PD. Pasar Jaya, Pasar Minggu, South Jakarta which has been carried out since March 27, is targeted to be completed by the end of April. This arrangement is carried out through collaboration between Bina Marga Sub-agency, Water Resources (SDA) Sub-agency, and City Park and Forestry Sub-agency.

Current progress has reached 50 percent

Pasar Minggu Sub-district Bina Marga Unit Coordinator, Rahman Hakim mentioned, arrangement implemented on sidewalk with length 56 meters and width 2.5 meters.

Bina Marga Personnel Repair Sidewalk on Jalan Setiabudi Raya

"Current progress has reached 50 percent. We are targeting to finish it by the end of April," he said, Tuesday (4/13).

For this sidewalk arrangement work, his side deployed 8 personnel to install paving blocks and create six ditches.

Meanwhile, SDA personnel assisted in dredging mud sedimentation and building manhole. Then, City Park and Forestry Unit personnel built 50-centimeter parks on the left and right sides of the sidewalk.

"This arrangement is not only to beautify the area, but also to make pedestrian safer and more comfortable," he stated.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye801 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye544 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye520 personAldi Geri Lumban Tobing
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye431 personAnita Karyati
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye429 personDessy Suciati