You don't have javascript enabled. Good luck with that.
Pencarian
Dua Sumur Resapan Dibangun di Jl Kayu Manis Barat
.
photo Nurito - Beritajakarta.id

Two Wells on Jalan Kayu Manis Barat Being Built

Each well will have 20 meters depth with distance between them about 15 meters

The Matraman Sub-district Water Resources (SDA) Task Force has started building two infiltration wells in residential areas, Jalan Kayu Manis Barat Gg. Lontar 3, RT 01/01 Kayu Manis Urban Village, East Jakarta.

Matraman Sub-district SDA Taskforce Coordinator, Agus Sutono said as many as six personnel involved to smoothen the work that was targeted to be complete next week.

21 Personnel Clean Infiltration Wells and Biopores in Panggang Island

"Each well will have 20 meters depth with distance between them about 15 meters," he said, Thursday (4/22).

He explained it was conducted to overcome flood problem triggered by blockage of the water channels as high as 80 centimeters with 60 centimeters depth in the area. This channel was known connecting the Palmeriam Urban Village with the crossing under the railroad tracks.

"Unfortunately it is often clogged with garbage dumped by locals," he stated.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye639 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye522 personFolmer
  3. Tengah Urban Village PPSU Personnel Clean Fire Debris

    access_time10-05-2024 remove_red_eye515 personNurito
  4. Jalan YRS III Repairs in South Jakarta Completed

    access_time10-05-2024 remove_red_eye491 personTiyo Surya Sakti
  5. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye485 personTP Moan Simanjuntak