You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaktim Bantu Uruk Lahan TPU Semper

East Jakarta SDA Helps Earth Fill at Semper Public Cemetery

East Jakarta Water Resources (SDA) Sub-agency assisted for earthwork in Semper Public Cemetery (TPU), North Jakarta that will be used as an additional burial ground for COVID-19 bodies.

We plan to fill it with clay to one meter high

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto mentioned, earth fill at Semper Public Cemetery has been carried out since Wednesday (6/30). The land on cemetery will be mixed with clay dredged from JGC Side C Reservoir, Cakung and Ria Rio Reservoir that have been dried beforehand.

"Earth fill has been started since yesterday at Semper Public Cemetery. We plan to fill it with clay to one meter high. Since the land was originally rice field, it must be compacted first," he explained, Thursday (7/1).

Parks Agency is Ready to Face Burial Surges under Covid-19 Protocols

On the first day, his side deployed five big trucks with capacity 22 cubic meters to transport clay which dredged from two reservoirs.

According to him, his side has asked North Jakarta Government to prepare heavy equipment to compact the land faster," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing