You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air di Jl Kikir Kayu Putih Capai 25 Persen
....
photo Nurito - Beritajakarta.id

Channel Development on Jalan Kikir Kayu Putih Reaches 25 Percent

It is targeted to be completed in the next two and a half months

The water channel development up to 1,178 meters on Jalan Kikir, Kayu Putih Urban Village, Pulogadung, East Jakarta, which has been ongoing since early August 2021 has touched 25 percent.

Drainage Development and Improvement Division Head, Tengku Saugi Zikri said, it was aimed at following up on residents' requests submitted through the Musrenbang.

East Jakarta Develops Drainages in Seven Locations

During the 2020 Musrenbang, they proposed the development of a water channel in order to anticipate flooding in the rainy season. Most channels were damaged, moreover some points should be built new channels.

"It is targeted to be completed in the next two and a half months," he uttered, Tuesday (8/24).

He added, it would spend a budget of Rp 2,029 billion. Its development was done through e-catalog purchasing system.

"Hopefully, it is able to minimize flooding when it rains. This water channel material uses U-Ditch concrete with a size of 60 centimeters," he concluded.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1205 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1050 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye903 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye728 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye569 personDessy Suciati