You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Sepanjang 1 Kilometer di Jalan RE Martadinata Tanjung Priok Dikuras

Channel on Jalan RE Martadinata Dredged to Prevent Inundation

Tanjung Priok Sub-district Water Resources (SDA) Unit dredged water channel along 1 kilometer on Jalan RE Martadinata, RT 01/14, Tanjung Priok Urban Village, Tanjung Priok Sub-district, North Jakarta.

Dredging work remains 500 meters until Bone Park's Water Gate area

Tanjung Priok Sub-district SDA Unit Supervisor, Muhammad Sanusi conveyed, channel was dredged due to mud silting as high as one meter.

"Mud silting can trigger inundation in Bone Park and Karapan Sapi Park. So, we normalize the channel to its initial depth of about two meters from the road surface," he mentioned, Friday (8/27).

Channel on Jalan Kebagusan Raya Dredged

According to him, channel has been dredged since July 2, 2021 by 8 personnel.

"We start dredging the channel from around Tanjung Priok Port Post 1 and now it has reached about 500 meters," he conveyed.

Every day, his side collected about 8 cubic meters of garbage and mud sedimentation from the channel.

"Dredging work remains 500 meters until Bone Park's Water Gate area. The work is estimated to be completed no later than December," he informed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close