You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Jaksel Tata Trotoar di Jalan Gatot Subroto

Damaged Sidewalks alongside Jalan Gatot Subroto Being Repaired

Thus far, around 20 points have been repaired

The South Jakarta Bina Marga Sub-agency is seen repairing damaged sidewalks alongside Jalan Gatot Subroto, Mampang Prapatan. It was carried out starting from Jalan HR Rasuna Said to LIPI Building.

South Jakarta Bina Marga Sub-agency Head, Heru Suwondo said, the repair involved eight PJLP personnel has been carried out since Tuesday (8/24).

Four Sidewalk Points on Jalan Labu Being Repaired

"These sidewalks have two to ten meters length with 3.5 meters width," he said, Wednesday (9/1).

Besides replacing the sliding and corrugated paving blocks, they were also repairing the damaged guide tiles for people with disabilities.

"Thus far, around 20 points have been repaired, one of them is in the front of Jamsostek Tower Building. We're still following another damaged point, this is for the convenience of passing pedestrians," he concluded.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye357 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye353 personAldi Geri Lumban Tobing
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved

close