You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Pembuatan Turap Saluran Jl Percetakan Negara V

Water Channel on Jalan Percetakan Negara V Normalized

Central Jakarta Water Resources (SDA) Sub-agency is normalizing water channel on Jalan Percetakan Negara V, Rawasari Urban Village, Cempaka Putih. This normalization work is targeted to be completed by the end of September 2021.

Flood often occurs in this location, especially when it rains heavily

Central Jakarta SDA Sub-agency's Maintenance Section Head, Achmad Daeroby mentioned, channel normalization was carried out to follow up resident's request through Musrenbang. The normalization work consisted of mud dredging, repair, and leveling retaining wall.

"Flood often occurs in this location, especially when it rains heavily. Residents also request for it," he stated, Saturday (9/18).

East Jakarta Mayor Monitors Normalization Work on Munjul Reservoir

The channel's length is 72 meters with 1 meter wide and slurry cast of 40 centimeters.

"We deploy 22 personnel to normalize it from September 10 and is targeted to be completed by the end of September. Current progress has reached 20 percent," he explained.

Linked News
Popular News indeks
  1. Jakarta's Central Statistics Agency Records Inflation at 0.63 Percent

    access_time02-03-2026 remove_red_eye863 personFolmer
  2. Liquor Raids in East Jakarta Continue to Be Intensified

    access_time02-03-2026 remove_red_eye640 personNurito
  3. Pramono: Jakarta Ready to Pay Out Holiday Bonus to ASN

    access_time04-03-2026 remove_red_eye544 personDessy Suciati
  4. Transjakarta`s Blok M–Soetta Airport Route Served by Metrotrans Low Entry Buses

    access_time05-03-2026 remove_red_eye473 personAldi Geri Lumban Tobing
  5. Commission D Prioritizes High-Impact Programs for Residents

    access_time04-03-2026 remove_red_eye472 personFakhrizal Fakhri