You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Pembuatan Turap Saluran Jl Percetakan Negara V

Water Channel on Jalan Percetakan Negara V Normalized

Central Jakarta Water Resources (SDA) Sub-agency is normalizing water channel on Jalan Percetakan Negara V, Rawasari Urban Village, Cempaka Putih. This normalization work is targeted to be completed by the end of September 2021.

Flood often occurs in this location, especially when it rains heavily

Central Jakarta SDA Sub-agency's Maintenance Section Head, Achmad Daeroby mentioned, channel normalization was carried out to follow up resident's request through Musrenbang. The normalization work consisted of mud dredging, repair, and leveling retaining wall.

"Flood often occurs in this location, especially when it rains heavily. Residents also request for it," he stated, Saturday (9/18).

East Jakarta Mayor Monitors Normalization Work on Munjul Reservoir

The channel's length is 72 meters with 1 meter wide and slurry cast of 40 centimeters.

"We deploy 22 personnel to normalize it from September 10 and is targeted to be completed by the end of September. Current progress has reached 20 percent," he explained.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye693 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye472 personDessy Suciati
  3. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye462 personBudhi Firmansyah Surapati
  4. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye461 personDessy Suciati
  5. 5M Movement Promoted to Create an Organized Utility Network

    access_time18-09-2026 remove_red_eye351 personFakhrizal Fakhri