You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Pembuatan Turap Saluran Jl Percetakan Negara V

Water Channel on Jalan Percetakan Negara V Normalized

Central Jakarta Water Resources (SDA) Sub-agency is normalizing water channel on Jalan Percetakan Negara V, Rawasari Urban Village, Cempaka Putih. This normalization work is targeted to be completed by the end of September 2021.

Flood often occurs in this location, especially when it rains heavily

Central Jakarta SDA Sub-agency's Maintenance Section Head, Achmad Daeroby mentioned, channel normalization was carried out to follow up resident's request through Musrenbang. The normalization work consisted of mud dredging, repair, and leveling retaining wall.

"Flood often occurs in this location, especially when it rains heavily. Residents also request for it," he stated, Saturday (9/18).

East Jakarta Mayor Monitors Normalization Work on Munjul Reservoir

The channel's length is 72 meters with 1 meter wide and slurry cast of 40 centimeters.

"We deploy 22 personnel to normalize it from September 10 and is targeted to be completed by the end of September. Current progress has reached 20 percent," he explained.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2174 personDessy Suciati
  2. Immersive Room and Glowing Forest Attractions Enliven Eid at TMII

    access_time26-03-2026 remove_red_eye966 personFakhrizal Fakhri
  3. 292 East Jakarta Personnel Mobilized for Eid Return Rush

    access_time25-03-2026 remove_red_eye750 personNurito
  4. Jakarta's Mudik to Jakarta Program Hits Rp21 Trillion in Transactions

    access_time25-03-2026 remove_red_eye739 personFakhrizal Fakhri
  5. 10 Transjakarta Amari Buses Operated at Kalideres Terminal

    access_time25-03-2026 remove_red_eye734 personTiyo Surya Sakti