You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan, Sudin SDA Jakbar Kerahkan 263 Pompa

263 Pumps Prepared to Handle Inundation in West Jakarta

West Jakarta Water Resources (SDA) Sub-agency has prepared 263 pumps to overcome inundation in this rainy season.

With readiness of personnel and equipment, hopefully inundation can be handled as soon as possible

West Jakarta SDA Sub-agency Head, Purwanti stated, her side prepared 263 pumps, consisting of 138 stationer pumps, 57 mobile pumps, 22 floating pumps, and 46 pump house in 8 sub-districts.

"All pumps are ready to operate to overcome inundation,"she said, Thursday (11/25).

Jakarta Prepares Personnel and Equipment for Floods

Moreover, her side also prepared 1,503 personnel, consisting of 556 pump operators, 906 task force personnel, 32 truck drivers, 9 heavy equipment operators, 3 combi jetting operators, and 1 crane car.

"With readiness of personnel and equipment, hopefully inundation can be handled as soon as possible," she asserted.

According to her, several areas prone to inundation in West Jakarta are located in Rawabuaya, Duri Kosambi, near Semongol River (Tegal Alur) Jalan Patra (Kebon Jeruk), Green Garden, Tubagus Angke.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye720 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye532 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye530 personAldi Geri Lumban Tobing
  4. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye522 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye505 personFakhrizal Fakhri