Sekretaris Connecting Channel's Wall Being Repaired
access_time December 09 2021 08:59 PM remove_red_eye 1000
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
It has been ongoing since a week ago. It is estimated to be complete in mid-December
Some 12 personnel of West Jakarta Water Resources (SDA) Sub-agency are seen repairing the 40-meter-long connecting channel wall of Sekretaris River on Jalan Budi Raya, Kebon Jeruk Urban Village.
West Jakarta SDA Sub-agency Head, Purwanti said the repair focused on two sides of the canal wa
lls, which are 20 meters each. The channel itself has 1.5 meters width with 2.20 meters depth.Breakwater Repair on North Side of Untung Jawa Island Completed"It is carried out, as the wall's cement had already collapsed," she expressed, Thursday (12/9).
Personnel were also repairing the land on the edge of the channel sheet pile for a mobile pump with 10,000 liters per second capacity.
To maximize it, a mobile pump unit had been placed at the location to suck water from the canal and dumped it into Secretary River to minimize flooding around the area.
"It has been ongoing since a week ago. It is estimated to be complete in mid-December," he stated.
Linked News
-
West Jakarta Bina Marga Repairs Sidewalk on Jalan Lingkar Luar Barat
access_timeSabtu, 04 Desember 2021 18:20 WIB
remove_red_eye1065 personTP Moan Simanjuntak -
Water Channel on Jalan Cempaka Jaya Repaired
access_timeJumat, 03 Desember 2021 22:36 WIB
remove_red_eye707 personAnita Karyati -
12 Potholes on Jalan Iskandar Muda Fixed
access_timeSenin, 29 November 2021 18:52 WIB
remove_red_eye853 personTP Moan Simanjuntak -
Collapsed Retaining Wall on Jl. Jeruk Raya Repaired
access_timeSenin, 22 November 2021 22:41 WIB
remove_red_eye1354 personTP Moan Simanjuntak
Popular News
indeks