Thousand Islands Builds New Channels on Tidung Island
access_time January 10 2022 04:13 PM remove_red_eye 908
Reported by Suparni | Translated by Nugroho Adibrata
Reported by Suparni | Translated by Nugroho Adibrata
Thousand Islands Water Resources (SDA) Sub-agency is building new water channels in Kampung Baru, RT 02/03, Tidung Island Urban Village, South Thousand Islands Sub-district.
It has been started since today and is targeted to be complete tomorrow
Thousand Islands SDA Sub-agency Head, Hendri said, it was aimed at anticipating flooding due to heavy rain and tidal floods, locally known as rob.
"This channel has 32 me
ters length using a 20-inch paralon. It also features a 40x40-centimeter control tub to filter waste before it flows into the central drain," he expressed, Monday (1/10). East Jakarta SDA Builds 30 Channels and 14 Floodgates in 2021He explained, eight personnel involved to work on the channel project in Kampung Baru area.
"It has been started since today and is targeted to be complete tomorrow," he stated.