You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran di Jalan Teuku Umar Rampung
....
photo Anita Karyati - Beritajakarta.id

Channel Normalization on Jalan Teuku Umar is Completed

Central Jakarta Water Resources (SDA) Sub-agency had completed channel normalization on Jalan Teuku Umar RT 10/05, Menteng Urban Village, Menteng Sub-district. After normalization, it is hoped there will be no inundation in the surrounding area, especially during heavy rain.

Normalization is conducted along 81 meters to follow up resident's request

Central Jakarta SDA Sub-agency's Maintenance Section Head, Achmad Daeroby mentioned, before normalization, the channel was damaged at several points due to channel construction that was still using precast concrete with diameter 50 centimeters.

"Normalization is conducted along 81 meters to follow up resident's request. The work started on December 26, 2021 and completed on January 12, 2021," he explained, Thursday (1/13).

Channel on Jalan Danau Sekawi Normalized by Tanah Abang SDA Unit

According to him, channel was normalized from Teuku Umar Police Post to Gondangdia Park Roundabout. The work was carried out by dismantling old channel and replacing it with U-ditch measuring 80x80x120 centimeters with depth up to 100 centimeters.

Besides, he continued, his side also made manholes in 11 points or every 3 meters to make it easier for his side to clean and check the channel.

"We deploy 24 Menteng Sub-district SDA Unit personnel to normalize it. Hopefully with channel normalization, inundation could be prevented, especially during heavy rain," he stated.

Linked News
Popular News indeks
  1. KPKP Agency Holds B2SA Goes to School to 10 Schools

    access_time24-04-2024 remove_red_eye822 personAldi Geri Lumban Tobing
  2. 10 Firetrucks Handle Fire in Kayu Putih

    access_time23-04-2024 remove_red_eye815 personNurito
  3. Water Channel Being Constructed on Pramuka Island

    access_time18-04-2024 remove_red_eye773 personAnita Karyati
  4. City - Sojitz Corporation Cooperate to Speed Up MRT 2A Phase

    access_time18-04-2024 remove_red_eye624 personFolmer
  5. Kebon Sayur Water Channel Dredged

    access_time19-04-2024 remove_red_eye500 personTP Moan Simanjuntak