You don't have javascript enabled. Good luck with that.
Pencarian
embangunan Saluran Phb Selesai, Jalur Busway di Jl I Gusti Ngurah Rai Dibuka Siang Ini
....
photo Nurito - Beritajakarta.id

Transjakarta Lanes along Jalan I Gusti Ngurah Rai Reopened

It is reported that two Transjakarta lanes along Jalan I Gusti Ngurah Rai, Klender, East Jakarta have been reopened since 1 PM, Wednesday (1/12) after being closed due to construction of connecting and crossing channels from residential areas to connecting channel (phb) at location.

Construction work had been completed last night, and we decided to reopen these lanes

"Construction work had been completed last night, and we decided to reopen these lanes," said Drainage Development and Improvement Division Head, Tengku Saugi Zikri.

He explained, the excavated land at the site had been cleared since this morning. Currently, all work is done 100 percent," he stated.

I Gusti Ngurah Rai Regular Lanes Re-opened Tonight

As for the information, connecting and crossing channels are made to minimize flooding that usually hits RW 09 and 10 Klender. Those channels are connected to Tegal Amba connecting channel.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye793 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye773 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye474 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye329 personTP Moan Simanjuntak