Transjakarta Lanes along Jalan I Gusti Ngurah Rai Reopened
access_time January 12 2022 06:48 PM remove_red_eye 897
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
It is reported that two Transjakarta lanes along Jalan I Gusti Ngurah Rai, Klender, East Jakarta have been reopened since 1 PM, Wednesday (1/12) after being closed due to construction of connecting and crossing channels from residential areas to connecting channel (phb) at location.
Construction work had been completed last night, and we decided to reopen these lanes
"Construction work had been completed last night, and we decided to reopen these lanes," said Drainage Development and Improvement Division Head, Tengku Saugi Zikri.
He explained, the excavated land at the site had been cleared since this morning. Currently, all work is done 100 percent," he stated.
I Gusti Ngurah Rai Regular Lanes Re-opened TonightAs for the information, connecting and crossing channels are made to minimize flooding that usually hits RW 09 and 10 Klender. Those channels are connected to Tegal Amba connecting channel.