You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Baru di Kelurahan Pulau Tidung Rampung

Construction of New Channels in Tidung Island Urban Village Completed

The Seribu Islands Water Resources (SDA) Sub-agency has completed the construction of water and crossing channels complete with a drainage control, locally known as bak control in RT 01/02 and 04/04, Tidung Island Urban Village, South Seribu Island Sub-district.

Hopefully, it can accommodate more volume of water and flow faster, including can overcome inundation

Seribu Islands SDA Sub-agency Head, Hendri expressed these channels have 64 meters in length. They were built to maximally anticipate puddles during heavy rains.

"The work started in February and was completed on Sunday (2/27)," he added, Monday (2/28).

This Weekend, Channel Dredging Work in Kalibaru Timur Completed

By so, it was expected to accommodate water in large quantities to overcome the inundation that previously often occurred in the area.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye1100 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye767 personAldi Geri Lumban Tobing
  3. Pramono: Climate Action Must Deliver Tangible Benefits to Residents

    access_time25-09-2026 remove_red_eye524 personDessy Suciati
  4. Pasar Baru Rowing Race Set to Take Place This Sunday

    access_time25-09-2026 remove_red_eye488 personFolmer
  5. Kelapa Gading-Manggarai LRT Serves 100,343 Passengers

    access_time26-09-2026 remove_red_eye462 personAldi Geri Lumban Tobing