You don't have javascript enabled. Good luck with that.
Pencarian
Petugas SDA Bangun Saluran Sepanjang 360 Meter di Pulau Panjang 2

Panjang Island to Have New Channel Soon

A 360-meter-long water channel is being built around the tomb of Sultan Maulana Mahmud Zakaria, Panjang Island, Kelapa Island Urban Village, North Seribu Islands Sub-district. It aims at anticipating puddles when it rains heavily.

It has been ongoing since March 9 and is targeted to be complete by the end of this March

Seribu Islands Water Resources (SDA) Sub-agency Head Hendri expressed that the channel would have 30 centimeters wide with 40 centimeters deep along the access road to the tomb.

"It is completed with a drainage control, locally known as bak control in the size of 80x80 centimeters wide with 60x60 centimeters deep," he expressed, Sunday (3/13).

May, Channels Dredging on Jalan Bekasi Raya Finished

The work involved around 20 workers conducting digging of channels, installation of channel walls, manufacturing control tanks, and castings.

"It has been ongoing since March 9 and is targeted to be complete by the end of this March," he stated.

Linked News
Popular News indeks
  1. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye944 personAldi Geri Lumban Tobing
  2. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye848 personAldi Geri Lumban Tobing
  3. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye831 personAldi Geri Lumban Tobing
  4. Pramono Praises JRF, Says City Is Becoming a Trusted Event Host

    access_time23-10-2026 remove_red_eye679 personDessy Suciati
  5. Jakarta Records Improved Air Quality on First Day of JRF 2026

    access_time24-10-2026 remove_red_eye662 personBudhi Firmansyah Surapati