You don't have javascript enabled. Good luck with that.
Pencarian
Personel Pasukan Biru Perbaiki Turap Saluran Jalan Basuki Cilangkap

SDA Personnel Repair Retaining Wall on Jalan Basuki Cilangkap

Following up on the resident's request, as many as 10 Water Resources (SDA) Unit personnel were deployed to repair the retaining wall of the micro channel on Jalan Basuki, RT 07/02, Cilangkap Urban Village, Cipayung, East Jakarta.

These covers are made using a cast-in-place concrete method

Cipayung Sub-district SDA Unit Head Dian Kartika mentioned that the retaining wall collapsed because of erosion and age.

After the repair, personnel were also instructed to install drain covers for the safety of pedestrians, especially children who often play around the channel during heavy rains.

Central Jakarta SDA Repairs Retaining Wall of Rawa Kebo Phb Channel

"These covers are made using a cast-in-place concrete method," she added.

According to her, personnel used the vacant land near the location to make concrete slabs to cover the channel. This work has been started on Wednesday (4/6) and is targeted to be finished before Eid al-Fitr.

"It takes a little longer because of rainy weather," she explained.

Linked News
Popular News indeks
  1. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye938 personAldi Geri Lumban Tobing
  2. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye840 personAldi Geri Lumban Tobing
  3. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye824 personAldi Geri Lumban Tobing
  4. Pramono Praises JRF, Says City Is Becoming a Trusted Event Host

    access_time23-10-2026 remove_red_eye670 personDessy Suciati
  5. Jakarta Records Improved Air Quality on First Day of JRF 2026

    access_time24-10-2026 remove_red_eye652 personBudhi Firmansyah Surapati