You don't have javascript enabled. Good luck with that.
Pencarian
 Relokasi Warga Penampang Basah Terkendala Unit Rusun
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Residents’ Relocation to Muara Baru Flat Delayed

The relocation of residents from east side wet section of Pluit Reservoir, North Jakarta, Penjaringan Urban Village, Penjaringan Sub-District, to Muara Baru Flat, had to be delayed. The reason is because the two blocks of the flat which reserved for the relocated residents, are already full.

We’ve been informed that the flat units are already full. So, we’re waiting for the readiness of the flat units for the next action

Overall, Muara Baru Flat has 12 blocks with a total of 1,200 units. Four blocks are already occupied since 2013. In the same year, eight more blocks were built by the developer as their obligation to make public facilities (fasum).

Currently, two of eight blocks have been handed over to Jakarta Housing and Government’s Building Department for the relocation of residents from the west side and wet section of Pluit Reservoir east side. The remaining six blocks with a capacity of 600 units have not been handed over yet by the developer.

52 Households Relocated Gradually to Daan Mogot Flat

“We’ve been informed that the flat units are already full. So, we’re waiting for the readiness of the flat units for the next action,” stated Head of Penjaringan Sub-District, Rusdiyanto, Tuesday (12/16).

According to Head of Region I Flat Management Unit (UPRS), Maharyadi, the two blocks which have been handed over by the developer are Block 11 and 12. These blocks have a capacity of 200 units and fully occupied. In details, 128 units for residents who were relocated from Pluit Reservoir west side and 72 units for residents who were relocated from Pluit Reservoir east side.

“We are still waiting for the handover of the other six blocks from the developer. I’ll tell the developer to speed up the handover process because they are needed for the relocation,” he uttered.

Daeng Mile (65), a resident of RT 19/17 Penjaringan, admitted that he has heard the information about the flat which intended for the relocation is already full. This condition makes the residents worry because Pluit Reservoir dredging has been started on Monday (12/1). They feared the dredging would affect the construction of their houses, which stood atop the reservoir, as well as the soil foundation that is prone to landslide.

“We worry the reservoir water would overflow during rainy season. Surely, this condition is very dangerous. We don’t want the incident in Banjarnegara that killed many people to happen here,” he expressed.

Meanwhile, Head of Jakarta Rivers and Reservoirs Normalization Implementation, Heriyanto, acknowledged that with the dredging Pluit Reservoir, the houses stood atop the reservoir become prone to landslide. The situation is getting risky since the Meteorology and Geophysics Agency (BMKG) has estimated that the peak of rainy season would occur in January.

“We have completed the dredging on the flow around Pluit Reservoir pump house. But, for the normalization on the east side, we are still waiting for the relocation,” he said.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye779 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati