You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Bronjong Batu di Dermaga Pulau Untung Jawa

Embankment Gabions on Untung Jawa Island Pier Repaired

The Seribu Islands Water Resources (SDA) Sub-agency is repairing gabions (locally called bronjong) on the outside of the pier to strengthen the 200-meter-long embankment of the Untung Jawa Island Main Pier.

Hope these gabions can be stronger to withstand the waves when bad weather occurs

Seribu Islands SDA Sub-agency Head Hendri said that the repair was conducted by stacking the stones in a wire basket as long as two meters, one meter wide, and 50 centimeters high.

"In a day, we can fix 17 to 20 gabions through 15 workers. So far around 30 meters of them have been repaired," he said, Monday (6/6).

Gabion Installed on Pesanggrahan Riverbank to Prevent Landslides

It has been ongoing since June and is targeted to be completed next week.

"Hope these gabions can be stronger to withstand the waves when bad weather occurs," he hoped.

Linked News
Popular News indeks
  1. Pramono Inaugurates GMAHK Taman Harapan Jakarta

    access_time25-10-2026 remove_red_eye513 personDessy Suciati
  2. JRF, Ye Concert Inject Rp 625 Billion into Jakarta's Economy

    access_time26-10-2026 remove_red_eye472 personDessy Suciati
  3. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye442 personAldi Geri Lumban Tobing
  4. Participating in a 10K Run, Pramono Calls JRF a Role Model for Running Events in Indonesia

    access_time25-10-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. Pramono Leads Youth Pledge Day Ceremony at City Hall

    access_time28-10-2026 remove_red_eye352 personFakhrizal Fakhri