You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Bronjong Batu di Dermaga Pulau Untung Jawa

Embankment Gabions on Untung Jawa Island Pier Repaired

The Seribu Islands Water Resources (SDA) Sub-agency is repairing gabions (locally called bronjong) on the outside of the pier to strengthen the 200-meter-long embankment of the Untung Jawa Island Main Pier.

Hope these gabions can be stronger to withstand the waves when bad weather occurs

Seribu Islands SDA Sub-agency Head Hendri said that the repair was conducted by stacking the stones in a wire basket as long as two meters, one meter wide, and 50 centimeters high.

"In a day, we can fix 17 to 20 gabions through 15 workers. So far around 30 meters of them have been repaired," he said, Monday (6/6).

Gabion Installed on Pesanggrahan Riverbank to Prevent Landslides

It has been ongoing since June and is targeted to be completed next week.

"Hope these gabions can be stronger to withstand the waves when bad weather occurs," he hoped.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1044 personFolmer
  2. Pramono Calls on Residents to Maintain Peace and Harmony During Ramadan

    access_time14-02-2026 remove_red_eye972 personFakhrizal Fakhri
  3. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye927 personNurito
  4. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye891 personAldi Geri Lumban Tobing
  5. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye843 personAldi Geri Lumban Tobing