You don't have javascript enabled. Good luck with that.
Pencarian
5.108 Titik Jalan di Jakarta Utara Telah Diperbaiki

January-May, 5,108 Potholes in North Jakarta Repaired

From January to May 2022, the North Jakarta Bina Marga Sub-agency repaired 5,108 potholes in six sub-districts.

We have repaired potholes with a total area of 45,708.4 square meters

North Jakarta Bina Marga Sub-agency's Road, Bridge, and Road Facility Section Head Untung Pitoyo explained that 5,108 potholes which covered an area of 45,708.4 square meters were repaired to follow up on residents' reports through complaint center, CRM, email, social media, and monitoring in the field.

"We have repaired potholes with a total area of 45,708.4 square meters," he stated, Saturday (6/11).

255 Joint Personnel Secure Jakarta Government's Asset in Batu Ampar

According to him, it included environmental, arterial, collector, and local roads.

In Tanjung Priok, the workers also repaired 605 potholes with an area of 8,173.4 square meters; 777 potholes with an area of 10,784.6 square meters in Cilincing; 1,059 potholes with an area of 6,686.6 square meters in Kelapa Gading; 531 potholes with an area of 1,741 square meters in Koja.

Then, 914 potholes with an area of 2,391 square meters in Pademangan and 628 potholes with an area of 4,932.8 square meters in Penjaringan. While the Road and Bridge Section had repaired 594 potholes with an area of 11,999 square meters.

"Road repair uses hot mix and colt mix asphalt which are determined based on road conditions," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati