You don't have javascript enabled. Good luck with that.
Pencarian
jembatan pulo gebang
.
photo Hendi Kusuma - Beritajakarta.id

Rp 448.6 B Pulogebang Integrated Terminal is Idle

The Jakarta Vice Governor, Djarot Saiful Hidajat, wondered why the Rp 448.6 billion Pulogebang Sentra Timur Integrated Terminal is still idle. The terminal with width 14.5 ha is able to accommodate hundreds of buses. In fact, the terminal is still empty from activity and looks dusty.

This terminal is the biggest in Asia

"This terminal is the biggest in Asia," said Djarot during his visit to the terminal, Tuesday (1/6).

Because of this condition, he asked Jakarta Head of Dept. of Transportation Benjamin Bukit to operate the terminal immediately.

Illegal Parking in East Jakarta, 59 Vehicles Netted

"The terminal must be operated maximally. It has big potency in accommodating AKAP buses in Jakarta," he added.

As for information, Pulogebang Terminal was built to replace Pulogadung Terminal. It has four floors. First floor is used as passenger access towards bus corridor, second floor is the city and inter-city public transport arrival area. The third floor will be used as food court and AKAP (inter-city) bus departure, while the fourth floor is functioned as Jakarta Dept. of Transportation office.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye653 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye394 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing