You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Ciliwung Terus Dikebut

Mud Dredging in Ciliwung River Accelerated

Central Jakarta Water Resources (SDA) Sub-agency keeps speeding up dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang, Senen.

It is targeted to be completed on June 9, 2024

The dredging that conducts in June 2022 has now reached 28.21 percent.

Central Jakarta SDA Sub-agency Head, Mustajab expressed dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang is aimed to reduce inundation and flooding in the surrounding area.

4,168 Cubic Meters of Mud Collected from Melati Reservoir

"It is targeted to be completed on June 9, 2024," he said, Tuesday (3/14).

Until February 14, it has been 228 meters long, or 28.21 percent of the total 808 meters long.

"The river has 24 meters wide," he explained.

This work involved ten personnel plus one amphibious excavator and two trucks.

"Hopefully, it is capable of maximizing water volume and reducing inundation in Senen," he stated.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1748 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1454 personFakhrizal Fakhri
  3. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1061 personBudhi Firmansyah Surapati
  4. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1030 personFakhrizal Fakhri
  5. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye972 personNurito