You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Ciliwung Terus Dikebut

Mud Dredging in Ciliwung River Accelerated

Central Jakarta Water Resources (SDA) Sub-agency keeps speeding up dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang, Senen.

It is targeted to be completed on June 9, 2024

The dredging that conducts in June 2022 has now reached 28.21 percent.

Central Jakarta SDA Sub-agency Head, Mustajab expressed dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang is aimed to reduce inundation and flooding in the surrounding area.

4,168 Cubic Meters of Mud Collected from Melati Reservoir

"It is targeted to be completed on June 9, 2024," he said, Tuesday (3/14).

Until February 14, it has been 228 meters long, or 28.21 percent of the total 808 meters long.

"The river has 24 meters wide," he explained.

This work involved ten personnel plus one amphibious excavator and two trucks.

"Hopefully, it is capable of maximizing water volume and reducing inundation in Senen," he stated.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye806 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye708 personDessy Suciati
  3. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye688 personNurito
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye646 personTiyo Surya Sakti
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye452 personDessy Suciati