You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Ciliwung Terus Dikebut
....
photo Wuri Setyaningsih - Beritajakarta.id

Mud Dredging in Ciliwung River Accelerated

Central Jakarta Water Resources (SDA) Sub-agency keeps speeding up dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang, Senen.

It is targeted to be completed on June 9, 2024

The dredging that conducts in June 2022 has now reached 28.21 percent.

Central Jakarta SDA Sub-agency Head, Mustajab expressed dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang is aimed to reduce inundation and flooding in the surrounding area.

4,168 Cubic Meters of Mud Collected from Melati Reservoir

"It is targeted to be completed on June 9, 2024," he said, Tuesday (3/14).

Until February 14, it has been 228 meters long, or 28.21 percent of the total 808 meters long.

"The river has 24 meters wide," he explained.

This work involved ten personnel plus one amphibious excavator and two trucks.

"Hopefully, it is capable of maximizing water volume and reducing inundation in Senen," he stated.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye793 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye772 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye474 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye322 personTP Moan Simanjuntak