You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Ciliwung Terus Dikebut

Mud Dredging in Ciliwung River Accelerated

Central Jakarta Water Resources (SDA) Sub-agency keeps speeding up dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang, Senen.

It is targeted to be completed on June 9, 2024

The dredging that conducts in June 2022 has now reached 28.21 percent.

Central Jakarta SDA Sub-agency Head, Mustajab expressed dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang is aimed to reduce inundation and flooding in the surrounding area.

4,168 Cubic Meters of Mud Collected from Melati Reservoir

"It is targeted to be completed on June 9, 2024," he said, Tuesday (3/14).

Until February 14, it has been 228 meters long, or 28.21 percent of the total 808 meters long.

"The river has 24 meters wide," he explained.

This work involved ten personnel plus one amphibious excavator and two trucks.

"Hopefully, it is capable of maximizing water volume and reducing inundation in Senen," he stated.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye682 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye665 personAnita Karyati
  3. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye629 personFolmer
  4. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye598 personAnita Karyati
  5. Jakarta Hosts 2026 UCWDC Asian Championship with 280 Dancers from Five Countries

    access_time20-11-2026 remove_red_eye580 personBudhi Firmansyah Surapati