You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Lumpur di Kali Ciliwung Terus Dikebut
....
photo Wuri Setyaningsih - Beritajakarta.id

Mud Dredging in Ciliwung River Accelerated

Central Jakarta Water Resources (SDA) Sub-agency keeps speeding up dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang, Senen.

It is targeted to be completed on June 9, 2024

The dredging that conducts in June 2022 has now reached 28.21 percent.

Central Jakarta SDA Sub-agency Head, Mustajab expressed dredging mud in the Ciliwung River segment of Jalan Kramat Kwitang is aimed to reduce inundation and flooding in the surrounding area.

4,168 Cubic Meters of Mud Collected from Melati Reservoir

"It is targeted to be completed on June 9, 2024," he said, Tuesday (3/14).

Until February 14, it has been 228 meters long, or 28.21 percent of the total 808 meters long.

"The river has 24 meters wide," he explained.

This work involved ten personnel plus one amphibious excavator and two trucks.

"Hopefully, it is capable of maximizing water volume and reducing inundation in Senen," he stated.

Linked News
Popular News indeks
  1. South Jakarta Keeps Anticipating Potential for Inundation and Flooding

    access_time17-04-2024 remove_red_eye860 personTiyo Surya Sakti
  2. 10 Firetrucks Handle Fire in Kayu Putih

    access_time23-04-2024 remove_red_eye722 personNurito
  3. Water Channel Being Constructed on Pramuka Island

    access_time18-04-2024 remove_red_eye708 personAnita Karyati
  4. City - Sojitz Corporation Cooperate to Speed Up MRT 2A Phase

    access_time18-04-2024 remove_red_eye550 personFolmer
  5. Kebon Sayur Water Channel Dredged

    access_time19-04-2024 remove_red_eye439 personTP Moan Simanjuntak