You don't have javascript enabled. Good luck with that.
Pencarian
Transjakarta Fasilitasi Transportasi Arus Balik di Terminal Pulogebang

Transjakarta Provides Backflow Transportation at Pulogebang Terminal

PT Transportasi Jakarta (Transjakarta) has provided six additional routes to anticipate the surge in return passenger arrivals at Pulogebang Bus Terminal. These routes have been operated from Wednesday (4/26) to Monday (5/1).

This service will ensure the transportation of travelers back to their destinations safely and comfortably

PT Transjakarta Secretary Division Head, Apriastini Bakti Bugiansri expressed the additional route from Pulogebang Terminal would serve transportation to other terminals such as Senen, Tanjung Priok, Kampung Rambutan, Pasar Minggu, Kalideres, and Pulogadung terminals.

Additional routes operate daily from 10 PM to 5 AM.

1,336 Travelers Have Arrived at Tanjung Priok Bus Terminal

"The first return flow from April 24 to 25 has been gone smoothly. We will then anticipate the second return flow," he conveyed, Thursday (4/27).

During the mudik exodus period, the Pulogebang Terminal becomes the center for bus passenger movements. He hoped that the availability of services from Transjakarta would make it easier for people arriving from their hometowns to go to their respective destinations.

"Hopefully, this service will ensure the transportation of travelers back to their destinations safely and comfortably," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1692 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1116 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye807 personDessy Suciati