You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Crossing Saluran Di Jalan H. Suit Rampung Hari Ini
....
photo Tiyo Surya Sakti - Beritajakarta.id

Crossing Channel Construction on Jalan Haji Suit Completed

The North Jakarta Water Resources (SDA) Sub-agency completed the construction of a channel crossing at Jalan Haji Suit, RT 04/06, Semper Barat, Cilincing.

This channel was made because the location is often inundated

Cilincing Sub-district SDA Executing Unit Field Coordinator, Nandi said the channel crossing construction is a follow-up to the proposal of the local RT/RW administrators.

"This channel was made because the location is often inundated due to small channel and unable to accommodate water in large quantities," he expressed, Monday (5/29).

City Secretary Setyono Monitors Water Level in Manggarai

He explained the channel, which was built four meters long, 100 centimeters high, and 80 centimeters wide involved five personnel since last week.

"Today has entered the finishing stage," he explained.

He hoped that the channel could minimize inundation when it rains.

"We also urge residents to take care by not throwing garbage into the channels," he stated.

Linked News
Popular News indeks
  1. Jakarta to Go Dark for One Hour on April 26, 2025

    access_time24-04-2025 remove_red_eye1264 personAldi Geri Lumban Tobing
  2. Earth Day in Jakarta Reduces 297 Tons of Carbon Emissions

    access_time27-04-2025 remove_red_eye340 personBudhi Firmansyah Surapati
  3. Pramono Wants to Strengthen Betawi Culture

    access_time26-04-2025 remove_red_eye334 personDessy Suciati
  4. Residents Advised to Apply for PPSU and Damkar Positions at Urban Village Offices

    access_time23-04-2025 remove_red_eye314 personFakhrizal Fakhri
  5. Earth Day, Pramono Encourages Citizens to Switch Off Lights Simultaneously

    access_time26-04-2025 remove_red_eye305 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik