You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Jalan Pramuka Sari III Dinormalisasi

Collapsed Sheet Pile on Jalan Pramuka Sari III Repaired

The Central Jakarta Water Resources (SDA) Sub-agency has started repairing the collapsed sheet pile on Jalan Pramuka Sari III, Rawasari, Cempaka Putih.

We repair the sheet pile with a mixture of cement, sand, and split stone

Cempaka Putih Sub-district SDA Executing Unit Head, Subandi expressed the repair was carried out, as the sheet pile had blocked the flow of water.

"We repair the sheet pile with a mixture of cement, sand, and split stone," he said, Tuesday (6/6).

Collapsed Sheet Pile in Grogol Selatan Being Repaired

The repair is carried out 50 meters long, 20 centimeters wide, and 60 centimeters high.

"We involve 15 personnel to make repairs," he explained.

It has been ongoing since May 28, 2023 and will be completed by the end of this month.

"Hopefully, it can minimize inundation when it rains," he stated.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye990 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye728 personAldi Geri Lumban Tobing
  3. Pramono: Climate Action Must Deliver Tangible Benefits to Residents

    access_time25-09-2026 remove_red_eye485 personDessy Suciati
  4. Pasar Baru Rowing Race Set to Take Place This Sunday

    access_time25-09-2026 remove_red_eye433 personFolmer
  5. 1,554 Cats in Central Jakarta Have Been Sterilized

    access_time25-09-2026 remove_red_eye365 personFolmer