You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Jalan Pramuka Sari III Dinormalisasi
....
photo Wuri Setyaningsih - Beritajakarta.id

Collapsed Sheet Pile on Jalan Pramuka Sari III Repaired

The Central Jakarta Water Resources (SDA) Sub-agency has started repairing the collapsed sheet pile on Jalan Pramuka Sari III, Rawasari, Cempaka Putih.

We repair the sheet pile with a mixture of cement, sand, and split stone

Cempaka Putih Sub-district SDA Executing Unit Head, Subandi expressed the repair was carried out, as the sheet pile had blocked the flow of water.

"We repair the sheet pile with a mixture of cement, sand, and split stone," he said, Tuesday (6/6).

Collapsed Sheet Pile in Grogol Selatan Being Repaired

The repair is carried out 50 meters long, 20 centimeters wide, and 60 centimeters high.

"We involve 15 personnel to make repairs," he explained.

It has been ongoing since May 28, 2023 and will be completed by the end of this month.

"Hopefully, it can minimize inundation when it rains," he stated.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye668 personNurito
  2. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye454 personNurito
  3. Rano Ensures Swift Action in Bukit Duri Fire Handling

    access_time19-07-2025 remove_red_eye396 personFakhrizal Fakhri
  4. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye389 personFolmer
  5. Munjirin Leads Simultaneous Planting at RPTRA Rawa Jaya

    access_time18-07-2025 remove_red_eye384 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik