You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakbar Perbaiki Turap Ambrol PHB Shelter Puri

Collapsed Sheet Pile on Jalan Puri Kembangan Repaired

The West Jakarta Water Resources (SDA) Sub-agency repairs the collapsed sheet pile of the Shelter Puri Connecting Channel on Jalan Puri Kembangan, Kembangan Selatan Urban Village, Kembangan Sub-district.

It is carried out because stone rubble has blocked the water flow

Kembangan Sub-district SDA Executing Unit Head, Mulyadi expressed the repair was conducted up to 2.3 meters high with a bottom width of 1.3 meters and a top width of up to two meters.

"It is carried out because stone rubble has blocked the water flow," he expressed, Thursday (9/21).

Collapsed Sheet Pile Repairs in Cawang Finally Completed

It has been carried out since Tuesday (9/19) and is targeted for completion in two weeks ahead.

"To do it, we deploy eight personnel to the location," he stated.

Linked News
Popular News indeks
  1. North Jakarta KPKP Ensures Sacrificial Meat is Safe for Consumption

    access_time27-05-2026 remove_red_eye853 personAnita Karyati
  2. Jakarta Government Hosts Jakarta Sales Mission in China

    access_time25-05-2026 remove_red_eye745 personAldi Geri Lumban Tobing
  3. Commission E Pushes for Evaluation of Free Private School Program

    access_time25-05-2026 remove_red_eye732 personFakhrizal Fakhri
  4. Dharma Jaya Supports Jakarta PWNU Qurban Program

    access_time27-05-2026 remove_red_eye721 personAldi Geri Lumban Tobing
  5. Transjakarta Adjusts Services During Eid al-Adha

    access_time26-05-2026 remove_red_eye612 personAldi Geri Lumban Tobing