You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan TPS3R di Rawasari Capai 50 Persen
....
photo Wuri Setyaningsih - Beritajakarta.id

TPS3R Construction in Rawasari Keeps Being Accelerated

The Central Jakarta Environment Agency continues to speed up the construction of a Reuse Reduce and Recycle (TPS3R) Waste Processing Site on Jalan Rawasari, Rawasari Cempaka Putih.

It will be executed on 1,000-square-meter-wide land

Pollution and Environmental Damage Control Division Head, Enrile Indro Prasetyo said TPS3R is a waste processing system with more effective and efficient waste chopping and compost sieving machine technology.

Until now, its construction has entered the foundation installation stage with the roof completed.

Kelapa Island Residents! Do Not Burn Garbage Carelessly

"We're preparing a location to place the machines," he said, Thursday (11/2).

He explained that next week, four TPS3R machines would be brought to the location. They were a conveyor machine, a back opener machine, an automatic waste sorting machine, and an organic waste biodrying machine.

"It will be executed on 1,000-square-meter-wide land. The location is right in front of our office," he explained.

According to him, the construction and procurement of TPS3R supporting equipment cost Rp 9.7 billion from APBD funds with details of Rp 4.2 billion for physical buildings and Rp 5.5 billion for equipment procurement.

"Hopefully, it can reduce the volume of waste in Bantar Gebang. Because the waste that is thrown away will only be residue," he stated.

Linked News
Popular News indeks
  1. Transjakarta Wins Popular Company Award in Land Transportation Sector

    access_time04-09-2024 remove_red_eye1004 personAldi Geri Lumban Tobing
  2. PPKUKM Agency Encourages Digital Transaction for Fostered MSMEs

    access_time04-09-2024 remove_red_eye901 personFolmer
  3. Transportation Agency Urges Mass Participants to Use Public Transportation

    access_time03-09-2024 remove_red_eye851 personAldi Geri Lumban Tobing
  4. Jakarta LRT Phase 1B Construction Achieves Positive Deviation of 26.64 Percent

    access_time06-09-2024 remove_red_eye844 personAldi Geri Lumban Tobing
  5. Transjakarta Prepares Parking Area and Additional Fleet for Grand Mass

    access_time05-09-2024 remove_red_eye760 personAldi Geri Lumban Tobing