You don't have javascript enabled. Good luck with that.
Pencarian
Revitalisasi Stadion Tugu Masuk Tahap Finishing

Tugu Stadium Revitalization Enters Finishing Stage

This year, it can be used already

The revitalization of the Tugu Stadium, Tugu Selatan Sub-district, Koja, North Jakarta, is finishing. It is targeted to finish this realization work soon and the stadium can be operational again this year.

Jakarta Youth and Sports Agency (Dispora) Head, Andri Yansyah said the stadium revitalization, which has been ongoing since October 2022, includes demolishing a stadium, constructing a field, a jogging track, a parking lot, as well as tribunes on the east side, and south side.

Revitalization of Halimun Transjakarta Bus Stop Begins

"This revitalization is done to rebuild the stadium," he expressed, Thursday (11/16).

He explained the work progress on the stadium field, jogging track, and east and south tribunes had been completely done and could be reused.

According to him, the current work only left finishing activities in the form of building supporting facilities such as the mezzanine and UKM tenants. After it was done, it would be handed over to the developer.

"There is now only finishing and transition left. This year, it can be used already," he stated.

Reporter : Budhi Firmansyah Surapati

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1055 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye858 personAldi Geri Lumban Tobing
  3. Posyandu-Posbindu Services Reach 1,600 Seniors and Toddlers in Utan Panjang

    access_time07-04-2026 remove_red_eye843 personFolmer
  4. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye826 personAldi Geri Lumban Tobing
  5. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye799 personTiyo Surya Sakti