You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air di Jl Kelapa Dua Wetan Terus Dikebut

Channel Construction on Jalan Kelapa Dua Wetan Accelerated

The construction of a new 486-meter-long water channel on Jalan Raya Kelapa Dua Wetan, Ciracas, East Jakarta, continues to be accelerated. The work carried out since October 9 has now progressed to more than 43 percent.

It is targeted to be completed on December 15

Development and Drainage Improvement Division Head, Tengku Saugi Zikri expressed the channel was built to follow up on residents' aspirations through the Musrenbang forum.

"It is targeted to be completed on December 15," he stated, Monday (11/20).

Jakarta Holds Mass Cleanup Action in Anticipation of Rainy Season

He explained the channel was being built using U-Ditch material measuring 80x80 centimeters over a length of 445 meters and a box culvert measuring 80 centimeters over a length of 27 meters, as well as a box culvert measuring 100 centimeters over a length of 14 meters.

"Hopefully, it can be completed on time," he hoped.

Reporter : Nurito

Linked News
Popular News indeks
  1. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye563 personTiyo Surya Sakti
  2. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye563 personAldi Geri Lumban Tobing
  3. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye434 personDessy Suciati
  4. Jakarta Gov Revs Up Efforts to Become Indonesia's Sport Tourism Hub

    access_time01-08-2026 remove_red_eye413 personFolmer
  5. Betawi Heritage Takes Center Stage at the 4th Betawi Mask Festival

    access_time01-08-2026 remove_red_eye406 personNurito