You don't have javascript enabled. Good luck with that.
Pencarian
81 Bangunan di Kalimalang Dibongkar

Buildings Along Kalimalang Inspection Road Demolished

As many as 15 joint personnel comprised of Satpol PP, Army, Police, Urban Village and Sub District Working Unit, demolished dozens of buildings on Jalan Raya Kalimalang, East Jakarta which affected by Bekasi, Cawang, Kampung Melayu (Becakayu) highway construction project as well as Kalimalang inspection road widening, Monday (3/30).

The demolishment is for the shake of road widening on Kalimalang inspection and Becakayu flyover

East Jakarta Mayor, Bambang Musyawardhana expressed the demolishment is a continuation of the previous one. The entire building have been bought since 1997-2013.

“The demolishment is for the shake of road widening on Kalimalang inspection and Becakayu flyover,” he said when being led the demolishment.

Transjakarta's Corridor XIII Flyover Project Targeted to Finish in August

So far, Musyawardhana added, there are so many land owned by residents which have not been bought. It starts from Penas T-Junction until Caman, Bintara, Bekasi T-Junction. Commonly, the building have not been bought because of there was no budget from Public Work Ministry (Kemen PU) last year.

“Currently, the budget is already prepared. We hope the residents prepare the document for re-examination before we buy the land,” he uttered.

Duren Sawit Sub District Head, Abu Bakar added, in Duren Sawit vicinity at least there are still 5 parcels of land which have not been bought. Among them are owned by Auto 2000 and Mitsubishi. "They have the certificate and asked for another measurement. It determines to know the location and boundaries,” Bakar added.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye905 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye581 personDessy Suciati
  3. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye435 personNurito
  4. Post-Fire Update: Rano Karno Ensures Public Services Remain Operational

    access_time09-08-2026 remove_red_eye386 personFolmer
  5. One Rasuna Said JPO to be Dismantled Due to Poor Accessibility

    access_time09-08-2026 remove_red_eye332 personFolmer