Eroded Cliff in Ciracas to Be Handled Permanently
Reported by Nurito | Translated by Rizky Mawardi
Personnel of Ciracas Sub-district's Water Resource, East Jakarta, will handle the eroded cliff at riverbank of Penganten Ali connecting channel, Jalan Mawar RT 11/06 Ciracas Urban Village. Permanent wall will be constructed.
The advance handling will be run by Ciracas Sub-district personnel
East Jakarta Water Resource Sub-agency Head, Wawan Kurniawan, admitted the eroded cliff along seven meters and 2.5 meters of wide on Thursday (1/11) ago has been handled temporarily by installing dolken wood.
Repair of Collapsed Channel on Jalan Bakti Completed"The advance handling will be run by Ciracas Sub-district personnel," he said, Monday (1/15).
Ciracas Sub-district Water Resource Coordinator, Deby, explained his side will permanently handle the cliff by installing river stone on eroded spots.
"It will be started next week," Deby said.
Deby added that her side is still mapping personnel to speed up the handling.
Meanwhile, Ciracas RW 06 Head, Ali Efendi, hopes permanent handling can be done quickly for the resident safety. He also requested that the collapsed bridge above the channel to be also repaired.
"It is hoped the repair wilk be done permanently. The bridge also needs to be repaired since it is the main access," he stated.
-
Next Week, Collapsed Channel in Baru Urban Village Replaced with U-Ditch Concrete
access_timeJumat, 12 Januari 2024 21:38 WIB
remove_red_eye316 personNurito -
BPBD: Residents Must Be Aware of Potential Landslides
access_timeJumat, 12 Januari 2024 21:09 WIB
remove_red_eye399 personAldi Geri Lumban Tobing